The ACC Committee serves in an advisory role to the Board. The goal is to communicate architectural and design needs to the Summit Ridge Board of Directors. Their primary role is not to establish policies, but rather to provide information and options to enable the Board to make fully informed decisions for the common good of the Association. This is accomplished in two ways:

  • Conducting regular inspections to ensure compliance with architectural standards and identify potential improvements.

  • Reviewing architectural change requests, proposing modifications or maintenance issues, and making recommendations to the Board to maintain and enhance the community’s aesthetic standards.

Draft

Guidance 

1

Typical changes that require an ACC Design Review

  • Shed addition.

  • Concrete and/or Paver work

  • Garden Beds

  • Solar Panels

  • Home Exterior changes

  • Fence changes / adds

  • Any alteration to items covered in the ACC Guidelines.

2

ACC Submittals

A Submittal to the ACC Committee for Design Review should include:

  1. Application Form

  2. Site Plan

  3. Roof Plan

  4. Floor Plan

  5. Building Elevations

  6. Specifications of changes

  7. Exterior Materials & Colors

  8. Landscape Plan (if applicable)

  9. Pictures (if applicable)

3

Approvals

  • Approval Notification is targeted to be within 10 days of a complete "Submittal".  (See Step 2)

  • Additional information may be requested to clarify a Submittal by members of the ACC Committee.

  • ​Additional time may be required if outside sources are needed to verify Codes, Easements, etc.

SUBMITTALS: Send an email with the Step 2 information above to:  architectural@idahoams.org